July 5, 2018

This automotive customer wanted to install several down draft paint booths during the new construction of their building. The ground excavation, framing of the pits and tunnels went very well. Next, PSI poured and finished the concrete for the down draft paint booths. Flooring is next and then PSI turns it over to the general contractor. 

Before

During

After

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
>