Category Archives for Building Maintenance Projects

Loading Dock Repairs

Repairs were needed quickly to this loading dock in Ferguson, Mo. The old dock plate was held in by four (4) 1/2" anchors x 6" long. PSI cut back the concrete dock area to good concrete, installed six (6) 3/4" threaded rod by 24" long and formed them into  the freshly poured concrete. The concrete face was finished and allowed to dry. The dock place was repaired and mounted to concrete dock. Customer is back in business!

Before

Completed Repairs

Replacement of Metal Steps and Landing in Maryland Heights, Mo.

The FED X building in Maryland Heights was required to have their side exterior steps and landing replaced. Not only were the steps rusted badly but the grate treads cause a safety issues with certain types of shoes. PSI fabricated a new stair assembly off certified engineering drawings. All metal was replaced, anti slip skid plates mounted on landing, step treads and new handrails installed to code. After clean up, the entire assembly was coated with a red primer.

Before

During

Completed Project

Charlack City Hall – Project

The objective of this project was to eliminate any safety issues and to improve the overall condition of the side porch on the City Hall. This required a complete replacement of the porch , steps, hand rails, porch railings, roof support columns and PSI also enclose the area under the porch.   

Before

During

Completed Project

Warehouse Restroom Renovation

This is one of many projects that PSI completed at Union 70. Again this shows the versatility that PSI offers to Property Management Groups.

Before

During

Finished Project

New Service Entrance

This manufacturing facility in St. Louis wanted to replace their damaged service entrance and handrail. PSI removed the old concrete , poured new landing and steps and finished off with a custom built heavy duty handrail. Back to new, like it never happened.

During

New concrete Steps
Weld on Handrails

Finished Project

New Concrete Steps
>