The officials from the municipality requested a bid to refurbish the rear entrance to the City Hall. PSI started by demoing the concrete porch floor, handrails, roof supports, stairs and garage door. During construction, the porch roof was supported by wood framework. A new concrete porch floor, metal roof supports, handrails, steps with handrails, blocked up garage door opening and finished off with new concrete adjacent to steps and in front of block wall.