May 21, 2018

This project included the tear out and replacement of all concrete sections in front of 30 dock doors. The customer requested thicker slabs with a higher psi yield strength for longer life. The schedule of replacement was coordinated with the shipping manager to minimize truck traffic and the loading and unloading of trucks.

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
>